Tunnel Cracks

The first 150 metres of the tunnel endured most of the force of the power station’s turbulent spent waters due to the area’s proximity to the draft tubes. A large crack developed along that area of the tunnel because of the constant impact. During construction of the museum, each metre and a half was fastened with rock anchors to prevent further cracking. Today, the crack is continuously inspected to ensure there is no further movement.